How does a Gablok self-build work in practice?

How does Gablok work in practice?


It all starts with the receipt of project plans drawn up in advance by an architect.

These are then analyzed and, if necessary, adapted to fit the dimensions of the Gablok blocks. A 3D sketch of the project enables the customer to visualize the result clearly and precisely in Gablok before making a commitment.

Four weeks after validation of the sketch, the Gablok kit is ready for delivery. This includes the assembly plan and all the structural elements required to build the insulated structure.

The Gablok team is on site at the time of the first delivery to help the customer get started. The customer is then free to construct the building on his own. Gablok remains available for further assistance.

Whether it's a house, workshop, garage, garden shed or outbuilding, self-build becomes child's play.